Fulton Hogan require temporary fencing for Watercare project

A large Watercare project is underway in Panmure to cater to current demand as well as preparing for future growth. With activities happening at the pump station and along Dunkirk Road for a planned 14 month project, a large area needed to be cordoned off for public safety.

Fulton Hogan called on the Temp Fence Technicians to provide and install temporary fencing around the construction site. 

The project includes building a new pump station on the corner of Tangaroa Street and Dunkirk Road with larger pumps and additional storage tanks to facilitate the storage of wastewater and prevent overflows during wet weather.

An upgraded gravity main and rising main are also being installed along a section of Dunkirk Road in the initial phase, which will be followed by a new connector pipeline from the Dunkirk Pump Station to take flows on a more direct route to the Eastern Interceptor.

The construction activities began at the pump station, with the construction of the gravity pipeline on Dunkirk Road and reserve beginning this month, and scheduled for completion August 2023.